Better Business On-Line
Visa Mastercard
Discover American Express
PayPal
Yahoo
Business Templates at CASBuy
 

Quality Project Plan Sample


General Contractor QAQC Manual





<Project Long Description>

<Project Short Description>

<Project #>

                                                           

 

 

<Company Full Name>

<Address>

QUALITY ASSURANCE

and

QUALITY CONTROL

PLAN

 

Insert Company Logos

 

Quality Control Manger

<QAQC Mgr Name>

Phone:

Fax:

Cell:

 

Approval Log:

 

Client Project Director: __________________________ Date:_________

<Short Company Name> Senior Management:_______ Date:_________

Project Director: ________________________________ Date:_________

Project Manager: _______________________________ Date:_________

QAQC Manager: _______________________________ Date:_________


 

NOTES FOR MODIFYING AND CUSTOMIZING THIS DOCUMENT TO FIT SPECIFIC REQUIREMENTS:

The first action should be to save copies of all the documents for future use and restoring actions required.

Keep in mind that this document’s intent is to provide a general guideline for creating specific QA/QC plans based on each individual organization’s QA/QC procedures and requirements.   

o    Get copies of the Project’s Contract Documents including the Drawings and Specifications.

o    Consider each Division of Work in the Specifications while at the same time reviewing the related drawings. Don’t try to repeat what is in the Contract Documents.

o    The Exhibits noted are sample of the types of reports and logs needed, such as;  

§  Exhibit 1 - Schedule / Status of Project Special Inspections

§  Exhibit 2 – Quality Control Inspection Report

§  Exhibit 3 – Testing Logs

§  Exhibit 4 – Deficiency Logs

§  Exhibit 5 – Photo Documentation Logs, etc.
If possible use Reports, Logs, and procedures that are already developed and in use. It is much better to incorporate than to create.

o    Topics listed in this template under each division are general and not project specific. Detail as required to comply with the project requirements.

o    Describe specific project requirements in related sections.

o    Be sure to remove items that have no relevance to the project, i.e. Membrane Roofing when all roofs are Asphalt Shingles.

Competent parties should review all documents to ensure that all project regulatory and legal requirements are addressed.  

Execute a “Search & Replace” (Ctrl-H) to replace terms in <example> with your company’s specific names and titles as required.

If your organization has different titles for individuals approving or taking action, execute a “Search & Replace” (Ctrl-H) to replace the titles noted with the correct title in the entire document.

Some of the topics included in this plan template may not be applicable to the project or your organization’s operations. READ EACH SECTION, MODIFY OR DELETE AS REQUIRED TO FIT YOUR ORGANIZATION’S REQUIREMENTS

One approach is to develop a plan for a typical large project, save it as a QA/QC Master Plan and develop project specific QA/QC plans for individual projects.

Lessons Learned sessions after project completion should be held to update and improve the QA/QC Master Plan.

After completion of editing and before publishing delete these notes.

 


 

Contents

QUALITY CONTROL PLAN SUMMARY_ 4

KEY PERSONNEL_ 4

QUALITY CONTROL TESTING_ 6

QUALITY PROCESSES_ Error! Bookmark not defined.

DIVISION 1 - GENERAL REQUIREMENTS_ Error! Bookmark not defined.

DIVISION 2 – SITE WORK_ Error! Bookmark not defined.

DIVISION 3 – CONCRETE_ Error! Bookmark not defined.

DIVISION 4 – MASONRY_ Error! Bookmark not defined.

DIVISION 5 – METALS_ Error! Bookmark not defined.

DIVISION 6 – WOOD & PLASTICS_ Error! Bookmark not defined.

DIVISION 7 – THERMAL AND MOISTURE PROTECTION_ Error! Bookmark not defined.

DIVISION 8 – DOORS AND WINDOWS_ Error! Bookmark not defined.

DIVISION 9 – FINISHES_ Error! Bookmark not defined.

DIVISION 10 – SPECIALTIES_ Error! Bookmark not defined.

DIVISION 11 – EQUIPMENT_ Error! Bookmark not defined.

DIVISION 12 – FURNISHINGS_ Error! Bookmark not defined.

DIVISION 13 – SPECIAL CONSTRUCTION_ Error! Bookmark not defined.

DIVISION 14 – CONVEYING SYSTEMS_ Error! Bookmark not defined.

DIVISION 15 – MECHANICAL_ Error! Bookmark not defined.

DIVISION 16 – ELECTRICAL_ Error! Bookmark not defined.


 

QUALITY CONTROL PLAN SUMMARY

The Quality Control Plan (QCP) for the <Project Long Description> <Project Short Description> Project has been developed to ensure that all work will be performed in accordance with the contract requirements. <Short Company Name> (Contractor) will maintain an inspection system which assures compliance with the contract requirements.

This QCP does not endeavor to repeat or summarize contract requirements. It describes the process which Contractor will use to assure compliance with those requirements. The QCP documents the categories of  work and references the processes described in Contractor’s Quality Assurance and Quality Control Manual (QAQC Manual), the Project Plans, Specifications and Contract Documents. Necessary details dealing with activities that may be overlooked in this plan will be addressed as the need arises and incorporated into the QCP.

Any indication of system deficiencies whether discovered as a result of the Owner's or Contractor's checks and tests, shall be brought to the immediate attention of the Quality Control Manager so the system can be modified to correct these deficiencies.

 

This Project Quality Plan shall be refined and modified as required to support Overall Project Requirements. Its intent is to implement and coordinate the testing programs by providing pertinent extracts of specifications, by facilitating tests, giving ample notice to testing agencies, and by coordinating quality control activities with all crafts and project management personnel.

KEY PERSONNEL

Contractor’s Project Quality Control Manager (QCM) has the overall responsibility for Contractor’s QCP program. The Quality Control Manager for this project is:

<QAQC Mgr Name>

Phone:

Email:

Radio:

Cell:

Fax:

Any questions, concerns, clarifications shall be directed to the Quality Control Manager.

A copy of this QCP including exhibits and any future revisions will be issued to the following personnel who shall ensure that all personnel and Subcontractors working under their supervision adhere to the QCP:

 

FIELD PERSONNEL

Project Superintendent

Phone:

Email:

Radio:

Cell:

Fax:

Craft Foreman

Phone:

Email:

Radio:

Cell:

Fax:

Craft Foreman

Phone:

Email:

Radio:

Cell:

Fax:

Craft Foreman

Phone:

Email:

Radio:

Cell:

Fax:

                (Add all copies & contacts as required to support Project Requirements)                                                               

 

PROJECT MANAGEMENT PERSONNEL

Project Director

Phone:

Email:

Radio:

Cell:

Fax:              

Senior Project Manager

Phone:

Email:

Radio:

Cell:

Fax:

Procurement / Subcontracts Manager

Phone:

Email:

Radio:

Cell:

Fax:

QUALITY CONTROL TESTING



All materials shall be inspected and tested to ensure conformance with the project requirements before it is released for use. Verification that all items conform to specified requirements and that all personnel performing work are properly qualified and certified as per the Project Specifications is the responsibility of the QCM and the Project Craft Foreman responsible for the specific portion of the project.

Contractor will coordinate with Owner’s Testing Agencies to ensure that all tests and special inspections called out in Section _______ - of the Project Specifications are completed in a timely fashion.

 QCM shall ensure that Contractor’s personnel provide Testing Agency proper notice so all required tests can be preformed.

Each Subcontractor and Vendor performing any design, shop fabrication or on-site activities shall submit a QAQC Plan that includes;

·         Written Quality Control Procedures that can be reviewed for completeness and adequacy relative to Subcontractor’s or Vendor’s Scope of Work/Services

·         A schedule for submitting proper shop drawings for approval prior to start of fabrication. Shop drawings shall indicate physical dimensions and details/profiles of all elements of work. Drawings shall also indicate dimensions, details and specific directions for all cutouts or easements required for equipment, accessories, utilities or service access.  

·         A detailed Approval Submittal, Fabrication and Delivery/Execution Schedule in sufficient detail to incorporate the Subcontractor’s Work into the overall Project Schedule

·         Defined Inspection Points, Witness and Hold Points

·         Defined submittals for Approval, For Record & For Construction Use

·         Actual Locations where Design and Shop Fabrication activities occur

·         Listing of sub-suppliers/vendors that require Shop Inspections

 The following fabricators and vendors have been identified for shop monitoring and inspection activities:

Examples:

Structural Steel Design / Fabrication

XYZ Steel Fabrication

Contact: _________

Address/Phone/Fax/Email

Concrete Supplier

Best Concrete Supply

Contact: _________

Address/Phone/Fax/Email
Carbon & Stainless Pipe Fabrication

Quality Pipe & Supply

Contact: _________

Address/Phone/Fax/Email

(Add all shops & vendor locations that apply)




Writing help with Procedures

Business Templates at CASBuy © Copyright 2023. CASBuy.com all right reserved.
Microsoft and the Office logo are trademarks or registered trademarks of Microsoft Corporation in the United States and/or other countries.

Store Design by CASBuy.com's:
In-House Site Developers


Business Templates at CASBuy